[1]
Pingo-Román, J.M.P.R. et al. 2025. Cost and Schedule Optimization in Building Projects Using an Integrated Management System in an Emerging Urban Context. Anales de Edificación. 11, 3 (Dec. 2025), 47–57. DOI:https://doi.org/10.20868/ade.2025.5642.