Imagen de portada

BIM Maturity Index: Analysis and comparison of architecture office’s BIM performance in Porto Alegre = Evaluación de Índice de madurez BIM: Análisis y comparación del desempeño BIM de las oficinas de arquitectura en Porto Alegre

Mónica María Stumpp, Rodrigo Vitoria Alves, Carlo Rossano Manica


DOI: https://doi.org/10.20868/bma.2021.2.4686

Texto completo:

PDF (English)

Resumen


Abstract

This study evaluated the BIM Maturity Levels of architecture offices in Porto Alegre (Brazil) by adapting the method developed by Succar [1]. Capacity maturity models, such as the one proposed by Succar [4] identify a set of improvements, of processes that allow implementers to achieve significant business benefits. This methodology proves to be relevant for case studies, as it has the advantage of proposing an assessment of the maturity degree of organizations in the adoption and performance of BIM in its processes, operations and relations with other organizations. To achieve the objectives, theoretical research, case studies and analysis were performed. It was carried out by applying a questionary in face-to-face interviews and converting the qualitative data obtained into quantitative, ultimately generating the BIM Maturity Index: a percentage number that can be classified and compared. For example, with the BIM transition, there was a significant increase of the preliminary design phase, mainly due to the large amount of information that must be provided in the initial modeling stage. This leads to the resolution of a large part of the project in this phase and, consequently, the reduction of the time spent in the– final phases, such as executive project, documentation, budgets and etc., corroborating with the exposed by the MacLeamy Curve, which indicates how BIM workflow works in contrast to the traditional workflow. The results indicate a significant discrepancy in BIM competences between the case studies while reasserting challenges faced by them in a regional scope: the scarcity of external stakeholders appropriately inserted on the BIM process and the undersupplied BIM knowledge offered in academic courses. It is possible to trace similar characteristics and conditions in all case studies.

Resumen


Este estudio evaluó los niveles de madurez BIM de oficinas de arquitectura en Porto Alegre (Brasil) mediante la adaptación del método desarrollado por Succar [1]. Los modelos de madurez de capacidad, como el propuesto por Succar [4], identifican un conjunto de mejoras, de procesos que permiten a los implementadores lograr importantes beneficios comerciales. Esta metodología resulta relevante para los casos de estudio, ya que tiene la ventaja de proponer una evaluación del grado de madurez de las organizaciones en la adopción y desempeño de BIM en sus procesos, operaciones y relaciones con otras organizaciones. Para lograr los objetivos se realizaron investigaciones teóricas, estudios de casos y análisis. Se llevó a cabo aplicando un cuestionario en entrevistas presenciales y convirtiendo los datos cualitativos obtenidos en cuantitativos, generando finalmente el Índice de Madurez BIM: un porcentaje que se puede clasificar y comparar. Por ejemplo, con la transición BIM, hubo un aumento significativo de la fase de diseño preliminar, principalmente debido a la gran cantidad de información que se debe proporcionar en la etapa de modelado inicial. Esto lleva a la resolución de gran parte del proyecto en esta fase y, en consecuencia, a la reducción del tiempo empleado en las fases finales, como proyecto ejecutivo, documentación, presupuestos, etc., corroborando con lo expuesto por MacLeamy Curve, que indica cómo funciona el flujo de trabajo BIM en contraste con el flujo de trabajo tradicional. Los resultados indican una discrepancia significativa en las competencias BIM entre los estudios de caso, al tiempo que reafirman los desafíos que enfrentan en un ámbito regional: la escasez de actores externos adecuadamente insertados en el proceso BIM y el conocimiento BIM insuficiente que se ofrece en los cursos académicos. Es posible rastrear características y condiciones similares en todos los estudios de caso.


Palabras clave


BIM; BIM Maturity; Project Managing; Case studies; Architecture offices; BIM; Madurez BIM; Gestión de Proyectos; Estudio de caso; Oficinas de Arquitectura

Referencias


B. Succar, " Building Information Modelling Maturity Matrix", Handbook of Re-search on Building Information Modelling and Construction Informatics: Con-cepts and Technologies, pp.65-103, 2009.

R.C. Ruschel, et all, "O ensino de BIM no Brasil: onde estamos?", Ambiente Construído, v. 13 (2), pp. 151-165, 2013.

E.S. Nardelli, (2018) "BIM and Public Building in Brazil", Proceedings of the 22th Conference of the Iberoamerican Society of Digital Graphics, [Online]. Available: https://www.proceedings.blucher.com.br/article-list/sigradi2018-312/list#articles

B. W. Succar and S. A. Williams, "Measuring BIM performance: Five metrics", Architectural Engineering and Design Management, v. 8, pp. 120-142, 2012.

W. Catelani. (2019), "Como avançar na maturidade BIM no Brasil?" Artigo do especialista. [Online]. Available: https://cbic.org.br/artigo-do-especialista-como-avancar-na-maturidade-bim-no-brasil/

J. S. Böes, J. de P. B. Neto and M. M. X. de Lima, "Modelo de maturidade BIM para instituições de ensino superior", Ambiente Construído, v.21, 131-150, abr./jun. 2021.

Garrido, C. M. et. all. "Using BIM for Last Planner System: Case Studies in Bra-zil", International Workshop on Computing in Civil Engineering, pp. 604-611, 2015.

B. Cornetet, and W. Florio, (2015) "Reflexão sobre a implantação do BIM em três escritórios de arquitetura em Porto Alegre, de 2010 a 2015", Proceedings of the Encontro Brasileiro de Tecnologia de Informação e Comunicação na Construção, [Online]. Available: https://www.proceedings.blucher.com.br/article-list/tic2015-256/list#articles

C. M. Garrido, et all, "Using BIM for Last Planner System: Case Studies in Bra-zil", Proceedings of the International Workshop on Computing in Civil Engi-neering, pp. 604-611, 2015.

E.M. Barison and E.T. Santos, (2013)"Atual cenário da implementação de BIM no mercado da construção civil da cidade de São Paulo e demanda por especialis-tas", in Modelagem da informação da construção: uma experiência brasileira em BIM, Ed. Capes, Curitiba.

M. A. L. Garbini and D. Q. Brandão, "Implantação da tecnologia BIM analisada em quatro escritórios de arquitetura", Cadernos Proarq, v. 21, pp. 125-146, 2013.

F. A. Machado, R. C. Ruschel and S. Scheer, "Análise da produção científica brasileira sobre a Modelagem da Informação da Construção", Ambiente Construído, v. 17, n. 4, pP. 359-384, out./dez. 2017.

R. das D. de Miranda and L. Salvi, "Análise da tecnologia Bim no contexto da indústria da construção civil brasileira", Revista Científica Multidisciplinar Núcleo do Conhecimento, v. 07, pp. 79-98 Maio 2019.

L. Oliveira and A. Pereira, (2011)"Mudanças metodológicas decorrentes da implantação recente de BIM em escritórios de arquitetura", in Proceedings of the 15th Conference of the Iberoamerican Society of Digital Graphics, [Online]. Available: https://itc.scix.net/pdfs/sigradi2011_287.content.pdf

L.L.A. de Souza, S.R.L. Amorim and A. de M. Lyrio, "Impactos do uso do Bim em escritórios de arquitetura: oportunidades no mercado Imobiliário", Gestão & Tecnologia de Projetos, v. 4 (2), p.26-53, 2009.

B. Succar and M. Kassem, M., “Macro-BIM adoption: Conceptual structures”, Automation in Construction, v. 57, p. 64–79, 2015.

B. Giel, and R. R. Issa, “Synthesis of existing BIM maturity toolsets to evaluate building owners, Computing in Civil Engineering, pp. 451-458, 2013.

W. R. dos. Santos, “Estudos de Caso de Implementação da Modelagem da Informação da Construção em Microescritórios de Arquitetura, dissertation, Insti-tuto de Pesquisas Tecnológicas do Estado de São Paulo, São Paulo, SP, Brazil, 2016.

C. WU, et al., “Overview of BIM maturity measurement tools”, Journal of Infor-mation Technology in Construction, v. 22, p. 34-62, 2017.

A. Rodrigues, “Grau de Maturidade BIM: Estudos de Caso em empresas proje-tistas de Arquitetura na cidade de São Paulo”, specialization monograph, Escola Politécnica da Universidade de São Paulo. São Paulo, SP, Brazil, 2018.

L. de O. Lima, “Análise de modelos de maturidade para medição da implemen-tação do building information modeling”, dissertation, Universidade Tecnológica Federal do Paraná, Curitiba, PR, 2019.

P. Praia, “A plataforma BIM na compatibilização de projetos de arquitetura e estrutura: estudos de caso”, dissertation, Universidade de Brasília, Brasília, DF, 2019.

MacLeamy, P. (2010). The Future of the Building Industry (3/5): The Effort Curv”, [Online]. Available: https://www.youtube.com/watch?v=9bUlBYc_Gl4

E. S. Checcucci, (2018) “Pesquisas de pós-graduação brasileiras sobre ensino e aprendizagem de BIM”, Proceedings of the Encontro Nacional Sobre o Ensino De BIM, [Online]. Available: em: https://www.antaceventos.net.br/index.php/enebim/2018/paper/view/68.

R. A. de Andrade, F. T. A. Lima and M. M. Borges, (2017) “O projeto integrado e o processo de projeto em BIM - aplicação e normas brasileiras”, Proceedings of XXI Congreso de la Sociedad Ibero-americana de Gráfica Digital, [Online]. Available: https://www.proceedings.blucher.com.br/article-list/sigradi2017-296/list#articles.

M. J. Giuseppe, N. da C. Ribeiro, P. C. Pellanda and M. de M. Reis, “Implementation Framework for BIM Adoption and Project Management in Public Organizations”, Journal of Civil Engineering and Architecture, v. 14, pp. 109-119, 2020.


Enlaces refback

  • No hay ningún enlace refback.


Copyright (c) 2021 Autor / BY-NC-ND

Licencia de Creative Commons
Este obra está bajo una licencia de Creative Commons Reconocimiento-NoComercial-SinObraDerivada 4.0 Internacional.